April 2022

In March 2022, the concrete slab was removed on roughly 200 m² at the Durandeau site under the supervision of La Charente County partner and HPC-Envirotec. The 0 – 0.50 m soil layer was loosened. This area displayed high metal(loid), PAH, PCB, and trichloroethylene concentrations...